IEC provided complete Engineering, Procurement, and Construction (EPC) for installation of photovoltaic (PV) systems at Upper Lake High School in the Upper Lake Union High School District (ULUHSD). The installation consists of PV modules installed on fixed-tilt ground mounted structures along with DC to AC inverters and other electrical, structural, and mechanical supporting equipment. The total installed solar capacity is approximately 162 kilowatts (or .16 megawatts). The solar PV system is expected to produce an estimated 250,000 kWh per year. Any excess energy produced is exported to the grid and MUSD is compensated by PG&E for the time-of-use value of the energy through net-energy metering.
“IEC was there for us through every step of the process. They were highly professional, and took the time necessary so all involved had an understanding of the project. Their employees were sympathetic to our Districts needs, making a very small District feel not only important but that our project was their top priority.”
~ Pat Iaccino, Superintendent