Gas-Fired and Cogeneration

Gas-Fired and Cogeneration

TPC Power Plant Layouts

IEC prepared preliminary site layouts for a proposed gas turbine power plant facility.

CLIENT:

TEXAS PETROCHEMICAL CORPORATION

IEC prepared preliminary site layouts for a proposed gas turbine power plant facility. The power plant was expected to be located at the Texas Petrochemical Plant and was permitted for 400MW.

The Texas Petrochemical Corporation was interested in evaluating various gas turbine configurations that would fit the available real estate within the facility. IEC prepared detailed layouts for the following configurations:

  • GE Frame 7FA Steam Plant (no steam turbine)
  • GE LM6000 PC Sprint Steam Plant (no steam turbine)
  • GE Frame 7FA Combined Cycle

Layouts were overlaid on the Texas Petrochemical Plot Plan and arranged to fit within the available space requirements and comply with industry standards and vendor spacing requirements for operations and maintenance.

IEC prepared preliminary site layouts for a proposed gas turbine power plant facility.
IEC prepared preliminary site layouts for a proposed gas turbine power plant facility.