IEC provided complete Energy Engineering, Energy Analysis, and Engineering, Procurement, and Construction (EPC) services for installation of photovoltaic (PV) systems at one (1) school site within the Tipton Elementary School District (TESD) District. As part of the project, IEC analyzed energy usage, characterize the energy use at the site, and identified energy reduction opportunities. The solar installation consists of PV modules installed on fixed-tilt ground mounted structure.