McClellan Upgrade Project Due Diligence Report

The Sacramento Municipal Utility District hired IEC to develop an economically viable alternative to bring the McClellan Power Plant into air emissions compliance.

CLIENT:

SACRAMENTO MUNICIPAL UTILITY DISTRICT

The McClellan Combustion Turbine Plant was encountering significant problems related to its ultra-high temperature catalyst (1,005F). The Sacramento Municipal Utility District hired IEC to develop an economically viable alternative to bring the power plant into air emissions compliance. The report recommended installing a quench air system to reduce the exhaust duct to 850 degrees F and replacing the catalyst from an ultra high temperature catalyst to a high temperature catalyst. The report also included a capital cost estimate and schedule.

The Sacramento Municipal Utility District hired IEC to develop an economically viable alternative to bring the McClellan Power Plant into air emissions compliance.
The Sacramento Municipal Utility District hired IEC to develop an economically viable alternative to bring the McClellan Power Plant into air emissions compliance.