Energy Storage

Energy Storage

Center Peaker Battery Energy Storage (BES) Project (10MW)

IEC provide engineering design for Center Peaker Battery Energy Storage (BES) project owned by Southern California Edison (SCE).

CLIENT:

SOUTHERN CALIFORNIA EDISON

IEC was contracted to provide complete design services for a Battery Energy Storage project owned by Southern California Edison (SCE). For the Center Peaker Battery Energy Storage Project, IEC was the Engineer of Record (EOR) and provided detailed engineering services for civil/structural, electrical, and mechanical. IEC’s scope of work included developing and designing complete permit and construction packages which required IEC to develop a project design criteria and work closely with the owner, equipment suppliers, and construction contractor to ensure all project requirements were met. The project was approved by both SCE and the local building department and became operational early 2017. The battery project includes a 10MW/4.3MWh (AC) General Electric Co. (“GE”) Battery Energy Storage System that will be fully integrated with an existing power plant.

IEC provide engineering design for Center Peaker Battery Energy Storage (BES) project owned by Southern California Edison (SCE).
IEC provide engineering design for Center Peaker Battery Energy Storage (BES) project owned by Southern California Edison (SCE).