Pilkington Heat Feasibility Study

IEC provided conceptual engineering for Pilkington’s waste heat recovery project.

CLIENT:

PILKINGTON

IEC provided conceptual engineering for Pilkington’s waste heat recovery project. Pilkington’s Lathrop facility manufactures flat glass products and, in the process, releases a substantial amount of thermal energy in the form of high temperature flue gas from the glass furnace. IEC evaluated the economics of developing a steam turbine generator (STG) facility powered by a waste heat boiler, which would be heated using the high temperature flue gas stream.

IEC provided conceptual engineering for Pilkington’s waste heat recovery project.
IEC provided conceptual engineering for Pilkington’s waste heat recovery project.