Power Studies and Analysis

Power Studies and Analysis

Woodland Generation Station Alternate Water Feasibility Study

IEC prepared a preliminary analysis of the feasibility of using waste water from a dairy farm to replace some of the WGS water demands.

CLIENT:

MODESTO IRRIGATION DISTRICT

The Modesto Irrigation District identified a source of good-quality wastewater generated by the Foster Farms Dairy, a milk-processing facility located less than a mile from MID’s Power Plant. This water would potentially be suitable to replace raw water use at the Woodland Generation Station (WGS). IEC prepared a preliminary analysis of the feasibility of using this water to replace some of the WGS water demands. The report included a complete water quality analysis, potential uses within the power plant and its impact on the existing water quality. The report included a final recommendation and a cost benefit analysis.

IEC prepared a preliminary analysis of the feasibility of using waste water from a dairy farm to replace some of the WGS water demands.
IEC prepared a preliminary analysis of the feasibility of using waste water from a dairy farm to replace some of the WGS water demands.