LADWP evaluated a program to install 125 MW of solar PV systems on or near City owned properties. IEC worked with LADWP’s Solar Energy Development Group to identify, develop, and perform preliminary engineering for these facilities. The development of these properties included, feasibility assessments, site evaluations, acquisition of permits/documentations, property mapping, development of preliminary engineering design packages, and the necessary services to prepare each potential property for further photovoltaic development and construction.