IEC was recently awarded a three-year contract to provide technical services support to LADWP for the development and upgrade of its 500kV and HVDC Transmission Systems for renewable projects, including the design of a new 500kV transmission line. Specific task work includes: Transmission System Studies and Analysis; Feasibility Studies; Land Survey, Real Estate, and Right-of-Way; Equipment and Material Procurement; Transmission Line Design and Upgrades; Transmission Line Documentation; Geotechnical Field Work; and Substation Design. To date, IEC’s Team has provided over $1.5 million in transmission services for this contract, including: Aerial LiDAR Survey Services for Transmission Lines; Geotechnical Reporting; and AC to DC Transmission Line Conversion Assessment Services.