IEC Corporation performed design engineering services for the Consolidated Electrical Distributors (CED) 50 MW Macho Springs Wind Farm (Phase 1) in New Mexico. The Macho Springs Wind Farm is a fast-track project that consists of twenty-eight 1.8 MW Vestas V100 Wind Turbine Generators (WTGs). The IEC design team completed detailed designs for the new 345 kV Ring Bus Macho Springs Switching Station, the 345 kV/34.5 kV Macho Springs Substation, and the wind farm’s electrical collection and SCADA systems.