Cache Creek Casino Resort Feasibility Study

IEC prepared a comprehensive feasibility study for the Cache Creek Hotel and Casino.

CLIENT:

CACHE CREEK CASINO RESORT

IEC prepared a comprehensive feasibility study for the Cache Creek Hotel and Casino. The study consisted of conceptual schematics, engineering analysis, economic analysis, and a final recommendation. IEC evaluated the following options to meet the estimated 8MW electrical peak load for the hotel/casino and the estimated 35,000-lbs/hr steam load for the hotel (HVAC, hot water, laundry, etc.) The options studied included:

  • Reciprocating engines using natural gas
  • Auxiliary boiler and steam turbine with cogeneration
  • Gas turbine and steam turbine with cogeneration
  • Gas turbine with cogeneration
  • PG&E transmission and substation upgrade