Cache Creek looked to IEC Corporation to provide complete engineering design and procurement services to install three 250kW natural gas fuel cells that provide base load electrical power and heat to the Casino Resort. IEC designed the plant to meet utility interconnection requirements and requirements for the California Energy Commission Self-Generation Incentive Program. IEC engineers provided designs to interconnect existing electrical and mechanical systems with the new plant.