IEC provided engineering design services for a complete one (1) MW solar photovoltaic system at the Ft. Ord Military Community near Monterey, California. These installations included both carport and ground mount PV systems for the parking lot. As the Designer of Record, IEC developed drawings for 10%, 65% and 100% design submittals for the U.S. Army Corps of Engineers. IEC was also responsible for managing the solar interconnection to the utility grid with PG&E.