Algonquin Repowering Feasibility Study

CLIENT: Algonquin Power Sanger LLC

IEC performed an engineering feasibility study to repower a Westinghouse combustion turbine with a GE LM6000 PC SPRINT combustion turbine at a combined cycle cogeneration facility. The study included developing plant performance and characteristics, evaluating equipment adequacy and capability, designing site layout and scope of work, etc. Based on the results of this study, Algonquin Power then hired IEC to provide preliminary design to begin the project.

GO BACK TO PROJECT GALLERY