SOLAR PROJECT GALLERY
BACK TO PROJECT GALLERY PAGE
IEC provided complete Energy Engineering, Energy Analysis, and Engineering, Procurement, and Construction (EPC) services for installation of photovoltaic (PV) systems at two (2) school sites within the Antelope Elementary School District (AESD) District: Antelope Elementary School and Berrendos Middle School. As part of the project, IEC analyzed energy usage across the District and performed a rate analysis to determine the optimal utility rate schedule for each school site. The solar installations consist of PV modules installed on fixed-tilt ground mounted structures.