CLIENT: Roseville Electric Utility
IEC conducted an evaluation of installing a mechanical chiller system for two (2) Siemens SGT-800 CTGS units at Roseville Energy Park. As part of the evaluation, IEC created preliminary general arrangement with a proposed chiller system that best fit the Siemens units. IEC also provided a summary of overall plant performance gain with chiller operations during the summer season based on the expected increased output. In addition, IEC prepared a project schedule and budget to fully install the mechanical chiller system.