![]()
Photovoltaic Engineering Review
IEC reviewed a number of documents for the Turlock Irrigation District (TID), such as system design sketches, system warranties, structural reports, equipment spec sheets, interconnection applications, and solar rebate applications. IEC conducted site inspections and performed engineering reviews of photovoltaic application packages for multiple TID customers. The purpose of the reviews was to ensure all the documents were in order and properly completed by each TID customer requesting a solar rebate. |