IEC Corporation is currently performing design engineering services for the Consolidated Electrical Distributors (CED) 50 MW Macho Springs Wind Farm (Phase 1) in New Mexico. The Macho Springs Wind Farm is a fast-track project that consists of twenty-eight 1.8 MW Vestas V100 Wind Turbine Generators (WTGs). The IEC design team is completing detailed designs for the new 345 kV Ring Bus Macho Springs Switching Station, the 345 kV/34.5 kV Macho Springs Substation, and the wind farm’s electrical collection and SCADA systems.