1 MW Solar PV Solar Grid at Ft. Ord

CLIENT: U.S. ARMY CORPS OF ENGINEERS / TRI-TECHNIC, INC.

IEC provided engineering design services for a complete 1 MW solar photovoltaic system at the Ft. Ord Military Community near Monterey, California. These installations included both carport and ground mount PV systems. As the Designer of Record, IEC developed drawings for a 10%, 65%, 100% and Corrected Final Design submittal and review process with the U.S. Army Corps of Engineers. As part of this review process, IEC prepared Project Specifications for the solar installation using SpecsIntact software. IEC was also responsible for coordinating the solar interconnection to the utility grid with PG&E.