SOLAR PROJECT EXPERIENCE

BACK TO PROJECT EXPERIENCE PAGE

Antelope Elementary School District PV Installations (2 Sites)

IEC provided complete Energy Engineering, Energy Analysis, and Engineering, Procurement, and Construction (EPC) services for installation of photovoltaic (PV) systems at two (2) school sites within the Antelope Elementary School District (AESD) District: Antelope Elementary School and Berrendos Middle School. As part of the project, IEC analyzed energy usage across the District and performed a rate analysis to determine the optimal utility rate schedule for each school site. The solar installations consist of PV modules installed on fixed-tilt ground mounted structures.

Copyright ©2018 IEC CORPORATION

GO BACK TO PROJECT EXPERIENCE

Follow IEC Corporation on Facebook Follow IEC Corporation on Twitter Follow IEC Corporation on Linkedin